Residential vs Commercial EV Charger Installer: Which Pays More?

The Short Answer
Residential pays faster and simpler — $6k–$12k/week gross for a solo installer. Commercial ticket sizes are 10–50x larger but require 45–120 day sales cycles. The highest-earning installers do both: residential for cash flow, commercial for scale.
This is the biggest strategic decision new installers make. Get it right and you're profitable in month one. Get it wrong and you starve waiting for a big deal.
Side-by-Side
| Attribute | Residential | Commercial |
|---|---|---|
| Ticket size | $1,200–$3,500 | $8,000–$100,000 |
| Sales cycle | 0–7 days | 45–120 days |
| Margin | 55–70% | 25–48% |
| Permit complexity | Simple one-line | Full stamped drawings |
| Job duration | 3–6 hours | 3–14 days |
| Payment terms | On completion | Net 30–60 |
When to Focus Residential
- You're starting out and need cash flow now
- You're solo without payroll pressure
- You live in a high-EV-density suburb
- You want a lifestyle business, not a scale business
When to Add Commercial
- You have 20+ residential installs completed and reviewed
- You have 6+ months of operating capital (for Net 30–60 payment terms)
- You've built a relationship with a property management group or dealer network
- You've completed EVITP certification (required for most commercial work)
The blended model wins
Top earners run 60% residential (cash flow) + 40% commercial (scale). Residential funds the crew that executes commercial. That balance is exactly what the course teaches you to build.
Ready to stop reading and start earning?
The complete EV Charger Installation Business course
One-time $39. Lifetime access. 13 bonuses including contracts, pricing calculators, and commercial bid templates. No subscription, no upsells.
Frequently Asked Questions
Can I do commercial work as a solo operator?
Small commercial (2–8 ports) yes. Larger commercial (fleet depots, 20+ ports, DCFC) requires a crew and general liability coverage above $1M.
How do I get my first commercial contract?
Direct outreach to property managers, HOAs, and small dealer groups. Warm intro from a residential customer works even better.
Do commercial jobs require a bond?
Some public sector jobs (NEVI, muni) do. Private commercial usually just requires proof of insurance and license.
What's the biggest commercial trap?
Cash flow — waiting 60+ days for payment while you've fronted materials. Solve with a business line of credit or milestone billing.
Related Guides

Michael Rivera
Texas Master Electrician with 12+ years in the trade and 500+ EV charger installations. Lead instructor at EVCharger Academy.
Learn Michael's full install-business system in the $39 EVCharger Academy course.